![]() |
![]() |
|
![]() |
| The recently finished upstairs hallway of blueEnergy's new Bluefields location. |
![]() |
| Open-air inside deck at the back of the second floor (residence floor). |
![]() |
| Water holding tank. |
![]() |
| Patio at the front of the second floor. |
![]() |
| The patio overlooks the street that leads to INATEC and also the unpaved "street" that is fabled to become the highway to Managua (no time soon!). |
![]() |
| Downstairs floor where blueEnergy's new office will be built. |
![]() |
| Returning international volunteer (USA), Amos Elias, discusses the framing for the first office wall with René Ramirez, local team member, and international volunteer Sebastian Lohr (France). |
![]() |
| Mathias Craig jerry-rigs the wireless modem for a temporary internet connection during the chaos of the move. |
![]() |
| A local worker lays the tile for the shower in the upstairs bathroom. |
![]() |
| The nearly completed upstairs bathroom. |
![]() |
| One of the new house's high-efficiency AC ceiling fans. |
![]() |
| The makeshift blueEnergy office during the move. |
![]() |
| The downstairs kitchen starts to take shape. |
![]() |
| The counters are poured for the downstairs kitchen. |
![]() |
| Counter tile is layed in the downstairs kitchen. |
![]() |
| Guillaume Craig and local friends Raul and Billy, play a round of makeshift ping-pong in the midst of the construction and moving chaos. |
![]() |
| A view of the back of the house from the backyard. |
![]() |
| Amos demonstrates the outside shower (a work in progres...). |
![]() |
| The new house's ultra-luxurious inline water pressure tank (red) and stove fuel tank (white). |
![]() |
| The crew: Guillaume, Mathias, international volunteer Valerie Pereira (France), Amos, and Christian. |
![]() |
Home | About Us | Learn More | What's Happening | Get Involved Multi-Media | Downloads | Links | Contact Us |
|
| webmaster@blueenergygroup.org | info@blueenergygroup.org |
|
A 501(c)(3) tax-exempt organization
|
:last updated - March 2007 | |