| August 2005: Lattice tower construction at INATEC |
![]() |
| The entrance to INATEC. |
![]() |
| A team of Rama digs one of the three anchor holes for the lattice tower. |
![]() |
| Pierre LeBlanc tries to escape from shop work. |
![]() |
| The work goes on into the night. |
![]() |
| 10 ft sections of the lattice tower. |
![]() |
| Ian Woofenden of Solar Energy International and HomePower Magazine drills bolt holes to attach two sections of tower. |
![]() |
| Ian cleans up a bolt hole. |
![]() |
| Philibert "Felipe" Maniez and Pierre "Jacobeam" Jamault of France drill bolt holes to attach two tower sections. |
![]() |
| The first 10 ft section of the tower is attached to the concrete base in the rain. |
![]() |
| Ismael Castillo of INATEC welds wire loops onto an anchor. |
![]() |
| Ian and Ismael discuss the pulley mechanism for raising tower sections. |
![]() |
| Ian works on the pulley system for raising tower sections. |
![]() |
| Ian works on the tower. |
![]() |
| Ian prepares to raise the pulley system to rais the next tower section. |
![]() |
| The first three sections of the lattice tower. |
![]() |
| The lattice tower under construction in the foreground and the tilt-up tower on the hill in the background. |
![]() |
| Ian works on the tower. |
![]() |
| Ian works on the tower. |
![]() |
| Mathias on the tower. |
![]() |
| Ariat and Norman review rope safety for tower climbing. |
![]() |
| Norman shows off the climbing safety harness. |
![]() |
| Ian and Kenry Martin prepare for the next section to be raised. |
![]() |
| The ground crew prepares to raise the next tower section (black piece in the upper right). |
![]() |
| The ground crew raises a tower section. |
![]() |
| Jacobeam takes a break from digging an anchor hole for another installation. |
![]() |
| The anchor hole crew takes shelter from the rain. |
![]() |
| An anchor hole fills up with its daily dose of water. |
![]() |
| Marina Stratagen of the Ministry of the Environment takes a break from the rain. |
![]() |
| Ariat and Mathias tighten guy wires in a downpour. |
![]() |
| The pulley mechanism at the top of the tower. |
![]() |
| Norman works on the final section of the tower. |
![]() |
| The tower is almost complete. |
![]() |
| After bailing rain water, the hole crew gets back to digging. |
![]() |
| Mathias at the top of the tower awaits the final section. |
![]() |
| View of the hill installation from the lattice tower. |
![]() |
| Norman guides the top section of the tower as a ground crew hoists it up. |
![]() |
| Mathias tightens a bolt to secure the final tower section. |
![]() |
| Ian and Mathias secure the top section. |
![]() |
| Ian and Mathias |
![]() |
| The completed lattice tower. |
![]() |
| The turbine is prepared for raising. |
![]() |
| An anchor for a new installation as seen from the lattice tower. |
![]() |
| An anchor for a new installation as seen from the lattice tower. |
![]() |
| The team prepares to receive the turbine. |
![]() |
| The team prepares to receive the turbine. |
![]() |
| Some final adjustments are made on the turbine. |
![]() |
| Finished! |
![]() |
Home | About Us | Learn More | What's Happening | Get Involved Multi-Media | Downloads | Links | Contact Us |
|
| webmaster@blueenergygroup.org | info@blueenergygroup.org |
|
A 501(c)(3) tax-exempt organization
|
:last updated - March 2007 | |