| November/December 2004: Rama Workshop |
![]() ![]() ![]() ![]() |
| From Rama Cay: Martha Thomas, Ventura Daniels, Jeffrey McCrea and Lorenzo Martínez. |
![]() ![]() |
| From Punta de Aguila: Pedro McCrea and Pedrito McCrea. |
![]() ![]() ![]() ![]() |
| From URACCAN: Henry Thyne, Jesús Salgado, Omar Ruíz and Bayardo Simons. |
![]() ![]() |
| From Grupo Fenix: Ain Uriel Salinas Espinoza and Alexis José Martínez Tercero. |
![]() |
| Workshop participants meet for introductions and a safety discussion. |
![]() |
| Ventura uses a drawknife to carve a blade. |
![]() |
| Pedro admires his handiwork. |
![]() |
| Henry and Ain position copper coils together for the stator. |
![]() |
| Ventura and Stacey work together to solder copper coils together for the stator. |
![]() |
| The completed 5-phase, 24 volt alternator. |
![]() |
| The group takes a break to pose for a picture with the completed alternator. |
![]() |
| Stacey prepares guy wires for the 60 ft. tower. |
![]() |
| Jeffrey covers a "dead-man" (guy wire anchor) with an anti-rust paint. |
![]() |
| Alexis cuts a 20 ft. section of 4 in. diameter tower pipe. |
![]() |
| Ismael creates the rebar structure for the concrete tower foundation. |
![]() |
| A group checks the connection between the tower base and the rebar foundation. |
![]() |
| Ventura and Martha start digging one of the four guy wire anchor holes. |
![]() |
| Jeffrey (above) and Pedrito dig towards the desired 5 ft. depth for the guy wire anchors. |
![]() |
| The rebar foundation and tower base are positioned. |
![]() |
| Ismael adjusts the tower base on the newly cast foundation. |
![]() |
| A guy wire anchor is lowered into a hole. |
![]() |
| An achor is positioned. |
![]() |
| Mathias (right) and Jesús fill an anchor hole and compact the soil. |
![]() |
| The three 20 ft. tower sections are brought to the hill. |
![]() |
| An old diesel engine serves as the anchor for a make-shift pully used for raising and lowering the tower. The rope raps around the pully and then is attached to the truck. |
![]() |
| The complete tower is raised without the turbine on a test run. |
![]() |
| The tower is lowered for turbine assembly. Note the truck and the pully on the left hand side of the picture. |
![]() |
| Henry attaches the rotor to the alternator. The turbine is ready. |
![]() |
| The turbine spins immediately after being raised. |
![]() |
| The "Green Machine". |
![]() |
| Out of focus. |
![]() |
| A close-up. |
![]() |
| Mathias demonstrates how to test and maintain a battery using the right safety equipment. |
![]() |
| Pedrito looks over the turbine manual. |
![]() |
| Ismael and former INATEC director Dionisio Pavón. |
![]() |
| Some of the many children that were curious about the workshop. |
![]() |
Home | About Us | Learn More | What's Happening | Get Involved Multi-Media | Downloads | Links | Contact Us |
|
| webmaster@blueenergygroup.org | info@blueenergygroup.org |
|
A 501(c)(3) tax-exempt organization
|
:last updated - March 2007 | |